Amid a controversy over the poor quality of repair work started on the 4-decade-old Cauvery bridge, the state highways department has decided to reconstruct the newly built parapet wall. The bridge stretches up to 541.46 metres across the Cauvery river, accommodating a 15-metre-wide road. It stands on 14 segments with a 2-metre-wide pedestrian pathway on either side.
↧