The public works department (PWD) has expedited work to fill up all the 19 ponds along the Uyyakondan river, which is flowing with full level. Already, three ponds along the stretch of Vazhavanthankottai between Trichy and Thanjavur have been filled and work is underway in the remaining ponds
↧